|
Title:
|
Disposition of the city sidewalk beneath public sidewalks at 880 N. Grand Ave. associated with future downtown street reconstruction projects.
a. Abandonment of existing vault on N. Grand Ave. Excavation of existing sidewalk, construction of building wall, backfill and surface restoration (completed and paid for by owner, by October 2016)
|