Title:
|
The Waukesha Water Utility Commission hereby declares that an emergency situation exists, as described in Section 62.15(1)(b) of the Wisconsin Statutes and directs the General Manager to negotiate a contract with DF Tomasini to assist in the relocation of existing water services to the 12-inch main on Perkins Avenue between Anoka Avenue and Arcadian Avenue at a cost not to exceed $23,000, plus costs not to exceed $545,000 for road reconstruction, street opening permit fees, stone, spoils, and inventory materials.
|