|
Title:
|
Disposition of the city sidewalk beneath public sidewalks at 741 N. Grand Ave. associated with future downtown street reconstruction projects.
a. Retain existing vault with a design plan approved by the Engineering Staff. Design and Construction Completed and paid for by the owner prior to October 2016. This properties vault also extends along South Street, but building is addressed on N. Grand Ave.
|