The Waukesha Water Utility Commission hereby declares that an
emergency situation exists, as described in Section 62.15(1)(b) of the
Wisconsin Statutes and directs the General Manager to negotiate a
contract with DF Tomasini to assist in the relocation of existing water
services to the 12-inch main on Perkins Avenue between Anoka Avenue
and Arcadian Avenue at a cost not to exceed $23,000, plus costs not to
exceed $545,000 for road reconstruction, street opening permit fees,
stone, spoils, and inventory materials.