Waukesha City Hall,  
201 Delafield Street  
Waukesha, WI 53188  
City of Waukesha  
Meeting Minutes - Final  
Plan Commission  
Wednesday, March 26, 2025  
6:00 PM  
Council Chambers, City Hall  
I. Call to Order  
II. Pledge of Allegiance  
4 - R.G. Keller, Joan Francoeur, Elizabeth Moltzan, and Jack Wells  
2 - John Schmitz, and Shawn Reilly  
Present  
Absent  
III. Roll Call  
Present  
5 - John Schmitz, Shawn Reilly, R.G. Keller, Joan Francoeur, and Elizabeth Moltzan  
1 - Jack Wells  
Absent  
IV. Public Comment  
V. Approval of Minutes  
ID#25-00294 Minutes of February 26, 2025  
A motion was made by Ald. Elizabeth Moltzan, seconded by Ald. Jack Wells, that  
the Minutes be approved. The motion carried by the following vote:  
5 - Shawn Reilly, R.G. Keller, Joan Francoeur, Elizabeth Moltzan and Jack Wells  
2 - John Schmitz and Corey Montiho  
Aye:  
Absent:  
VI. Consent Agenda  
Consent Agenda passed by unanimous consent.  
Minor Site Plan & Architectural Review - 2000 S. West Avenue - Walmart  
backup generator - A request from Walmart to approve the placement of a  
backup generator including switchgear and transformer, at the rear of the  
store along the north lot line near existing landscaping, at 2000 S West  
Avenue in the B-5 Community Business Zoning District.  
VII. Business Items  
Final Site Plan & Architectural Review - Chapman Road, Waukesha Water  
Utility Operations Center - A request from Waukesha Water Utility to  
approve final plans for a new Water Utility Operations Center to be  
constructed on parcel WAKC 1332001008, a vacant parcel along the north  
side of Chapman Drive in the I-1 Institutional District.  
A motion was made by Ald. Jack Wells, seconded by Member R.G. Keller, that  
this item be approved with conditions. The motion carried by the following vote:  
4 - R.G. Keller, Joan Francoeur, Elizabeth Moltzan and Jack Wells  
3 - John Schmitz, Shawn Reilly and Corey Montiho  
Aye:  
Absent:  
Final Site Plan & Architectural Review - Corporate Dr, Lot 3 of CSM No.  
10428, WAKC1382005007 - A request from Briohn Builders to approve  
final site plan and architectural review for a 117,000 sq. ft. industrial facility  
in the Waukesha Corporate Center under the M-3 Limited Business and  
Industrial Park District  
No roof top screening required, paint HVAC units neutral color.  
A motion was made by Ald. Elizabeth Moltzan, seconded by Ald. Jack Wells, that  
this item be approved with conditions. The motion carried by the following vote:  
4 - R.G. Keller, Joan Francoeur, Elizabeth Moltzan and Jack Wells  
3 - John Schmitz, Shawn Reilly and Corey Montiho  
Aye:  
Absent:  
Rezoning, Parcel WAKC1350994, Big Bend Road – A request from  
Belman Homes Inc., to rezone approximately 0.61 acres of land from T-1  
Temporary Zoning District to to Rs-3 Single Family Residential District in  
anticipation of the future development of two new home sites for Operation  
Finally Home along the east side of Big Bend Road.  
A motion was made by Ald. Jack Wells, seconded by Member R.G. Keller, that  
this item be approved. The motion carried by the following vote:  
4 - R.G. Keller, Joan Francoeur, Elizabeth Moltzan and Jack Wells  
3 - John Schmitz, Shawn Reilly and Corey Montiho  
Aye:  
Absent:  
Certified Survey Map - Parcel WAKC1350994, Big Bend Road – A  
request from Belman Homes Inc., to approve a 2-lot CSM on approximately  
0.61 acres of land in anticipation of the future development of two new  
home sites for Operation Finally Home along the east side of Big Bend  
Road.  
A motion was made by Member Joan Francoeur, seconded by Ald. Jack Wells,  
that this item be approved with conditions. The motion carried by the following  
vote:  
4 - R.G. Keller, Joan Francoeur, Elizabeth Moltzan and Jack Wells  
3 - John Schmitz, Shawn Reilly and Corey Montiho  
Aye:  
Absent:  
Conditional Use, 2000 Davidson Road, Freeland Cars – A request from  
Freeland Cars to approve plans to operate an automotive sales dealership  
at 2000 Davidson Road as was previously discussed at the December 18,  
2024 Plan Commission meeting. (PC24-0638)  
Visitor parking should be at 45 degrees for safe maneuverability, suggested by Keller.  
Striping to be complete by May 30th, 2025  
Have dimensioned striped plan done as presented by the architect and submitted to staff  
for approval.  
RG Keller will review striping plan and report to staff.  
A motion was made by Ald. Elizabeth Moltzan, seconded by Member R.G. Keller,  
that this item be approved with conditions. The motion carried by the following  
vote:  
4 - R.G. Keller, Joan Francoeur, Elizabeth Moltzan and Jack Wells  
3 - John Schmitz, Shawn Reilly and Corey Montiho  
Aye:  
Absent:  
VIII. Director of Community Development Report  
IX. Adjournment